News

WE HAVE MOVED!

19 Sep 2016

We have now moved premises. 

We have relocated to The Current Buildings Jarvis Gate, Sutton St James PE12 0ER

Our new telephone number is 01945 440779 

Watch this space for upcoming offers!

Importance of Regular Electrical Testing

12 Apr 2016

RMCS would like to make all Marina and Caravan Site Owners aware of the importance of regular Electrical Testing & Inspections. 

An RMCS Electrician was called out to a Distribution Unit on a Caravan Site which had caught fire over the weekend.  When he attended site he removed the fire damaged items as shown on the image.  This could have turned out a lot worse as the Distribution Unit had been installed between two static caravans and had been added on to by local electricians without specialist knowledge of caravan park installations.  When asked for a copy of the recent test certificate, it appeared that the site had not had a Periodic Inspection for some 10 years!

Just a reminder that Touring Caravan Sites and Marinas need Electricial Inspections every year and Static Caravan Sites need an inspection every three years.

To get further information Electricial Testing then please contact us

New Installation at Cameron House

12 Apr 2016

RMCS are pleased to be finalising the recent refurbishment of Cameron House Marina, Loch Lomond in Scotland.  The customer decided to choose our Sterling Pedestals complete with LED Lighting due to the slenderness of the pedestal which is ideally suited to the new pontoons which were supplied and installed by Inland & Coastal Marina Systems.  RMCS have also installed our Platinum SOS Stations which house a range of SOS equipment suitable for all types of emergencies. 

In total RMCS installed over 100 Sterling Pedestals and 10 Platinum SOS Pedestals.

For more information and prices on our Sterling Pedestals then please contact us.

Electricians Wanted

27 Jan 2016

Electricians and engineers required, MUST have experience in pipework.

Please send CV to sales@rmcs.co.uk

Merry Christmas and Happy New Year!

18 Dec 2015

All the staff at RMCS would like to wish all a very Merry Christmas and a Happy New Year!

Our offices close on Wednesday 23rd December at 5pm for the festive season and will re-open on Monday 4th January 2016 at 8am

Hot off the Press

23 Oct 2015

Our New Caravan Brochure has just arrived, be the first to get a copy.

Please contact us for a brochure at sales@rmcs.co.uk

PLANNING APPROVED

23 Oct 2015

Very exciting news this week as we have received planning perminsion for new offices and workshop. Works are to start immediately, in hopes for us to be in early to mid 2016. 

Mains Panels for Doha

23 Oct 2015

Rollins Marine has recently dispatched 5 custom built bespoke mains panels to the Royal Family in Doha. A team of specially chosen engineers are due to install these, expanding our tie with the Middle East.

Farm Business Innovation Show

25 Sep 2015

Come and see us at the Farm Business Innovation Show, NEC Birmingham, 11th & 12th November.

Stand No: 740

We will be exhibiting our extensive range of pedestals.

MET's 2015

25 Sep 2015

The world renown MET’s show is taking place at the Amsterdam RAI between 17th and 19th November 2015.  It will be our 6th consecutive year of exhibiting at this prestigious show.  We will be exhibiting our extensive range of pedestals and metering systems on Stand Number MYP45.  Please contact us for further details.

Caravan Site in North Lincolnshire

4 Sep 2015

We have just successfully completed the test and inspection of a large caravan site in North Lincolnshire.

Caravan Site in Norfolk

4 Sep 2015

We have successfully completed the test and inspection of a caravan site in Norfolk.

With the holiday season in the UK being very popular, a number of caravan sites have called us mid season to extend the number of pitches.

New Caravan Brochure

4 Sep 2015

Our new caravan brochure is currently being prepared. Please send us your details to get a new brochure hot off the press.

Smart Card Metering

4 Sep 2015

Caravan sites and Marinas are finding that people are using more electric as they have more technology in their caravans and boats. Why not ensure customers pay for what they use with Smart Card Metering.

Please contact us for more details.

2 New Vauxhall Vivaro Van's Join Our Fleet

12 Jun 2014

RMCS Welcome 2 New  Vauxhall Vivaro Van's to support rising installation demand due to our competativity.

Horning Boat Show - 3rd May 2014

2 May 2014

RMCS will be exhibiting at the Horning Boat Show on Saturday 3rd May 2014 on stand RG36.  We will be exhibiting a number of service pedestals and hook up units ideal for small boat yards and caravan sites.  Our stand representatives will demonstrate our products and give further details as requested

Seaworks International Show, Southampton - 10th - 12th June 2014

2 May 2014

RMCS will be exhibiting at the forthcoming Seaworks International Show in Southampton this year.  Please come and see us at stand A309 to see our Service Pedestals, Metering Systems, LIghting Solutions and SOS Equipment first hand.  Our stand representatives will be happy to answer your queries and give full demonstrations on all of our products.

Caravan Hook Up Units - Special Offers

2 May 2014

With the season now beginning its a good time to look at adding any additional Hook Up Units you may require or repair any existing units you may have.  Please contact the office to hear our Special Offers on our range of unmetered and metered Caravan Hook Up Units.

Retro fitting Service Pedestals with Smart Card Meters

2 May 2014

RMCS have in recent months carried out a number of installations for Marinas and Caravan Parks to retro-fit our Smart Card Meters into existing Hook Ups and Service Pedestals.  Due to the Refurbished Card Meters with Disposable Meter Cards becoming obsolete customer are deciding to upgrade their current metering systems.  We can offer bespoke packages for customers whatever the budget.  Please contact us for further information.

New Caravan Site Refurbishment

18 Feb 2014

RMCS have just successfully completed another Caravan Site Refurbishment in Buckinghamshire.  The customer required an upgrade of their existing dated Service Pedestals and Mains Panel.  The Service Pedestals were installed with our new Smart Card Metering System as well as brighter LED Lighting to coincide with the parks current High Level Lighting.

If you require any information on our Smart Card Metering Systems then please contact us.

Further Electrical Pedestals Installed in Norway

17 Oct 2013

We are pleased to confirm that the RMCS brand is increasing out in Norway with the installation of further RSP Pedestals at Nesna Batforening.  We have found that the Norwegian market favour the RSP Pedestal as it is suitable for the harshest weather conditions. 

New Website

23 Sep 2013

With the kind assistance of local company Double 7 Design Ltd, we are proud to launch of our new look website.  We decided it was time for a new feel to the website and after a busy year we have finally made this possible.

Northwich Marina

23 Sep 2013

Rollins Marine have been awarded the supply of Service Pedestals at the new Northwich Marina.  Platinum Pedestals were used throughout the installation with the Smart Card Metering System.

 A full design service was carried out on behalf of the client as well as full training on the easy to use Smart Card Metering solution. 

SOS Stations

23 Sep 2013

Following a very busy year so far, we are pleased to have bid farewell to 33 x SOS Stations being shipped to Turkey.  After months of talks with the customer and discussing their requirements we were able to build for them a personalised SOS Station to meet with their requirements.  

Dong Energy Wind Farm Facility, Barrow in Furnes

23 Sep 2013

Rollins were also awarded Barrow in Furness wind farm facility MEP services which is currently being installed.  Again high quality materials were selected including GRP and A4 stainless products.  A high capacity bilge and sanitation system is being installed to service the vessels, this proved to be a challenging part of the contract due to the 13 metre tidal range to pump from pontoon deck to the upland tanks.  The whole water installation being heat traced and insulted to cope with -20 degrees  wind chill.

Due to their outstanding mechanical and electrical design and installation teams, RMCS are currently setting the trend as the leaders in these exceptional turn key projects and are currently selected to service more of this type of installation over the coming months. 

RWE Wind Farm Support Pontoons - Port of Mostyn

23 Sep 2013

With their exception design and installation services Rollins Marine have recently finished the MEP services on the RWE Wind Farm Support Pontoons.

The project in excess of £250,000 utilised high quality materials throughout including GRP and A4 stainless products.  With a design life of 25 years the correct selection of materials was critical.  Rollins installed high and low level lighting on the 120 metre linkspan and bridges, panic alarms and CCTV.  On the pontoons 8 high level columns provided operational and task lighting along with 2 x emergency packs on each column.  The columns also had IP65 PTZ Camera’s in total 7 cameras have been installed for safety along the whole installation complete with night vision.

A new robust service bollard was manufactured bespokely for the project complete with 1” water supplies for the 8 x service vessels looking after the new offshore wind farm.

Girvan

23 Sep 2013

Rollins Marine are pleased to have been awarded the new marina services at Girvan Harbour on the West Coast of Scotland.  The project consisted of Smart Card Metered Platinum Pedestals, Platinum SOS Pedestals as well as decorative low energy LED Lighting.

Rollins Marine also installed the latest range of PTZ Camera’s and fixed camera linked to office for enhanced site security.

Forthcoming Show – MET’s 2013

23 Sep 2013

The world renown MET’s show is taking place at the Amsterdam RAI between 19th and 21st November 2013.  It will be our fourth consecutive year of exhibiting at this prestigious show.  We will be exhibiting numerous products including pedestals and metering systems on Stand Number EF42 in the Europe Foyer.  Please contact us for further details.